We are busy getting ready for Our Lady’s children. The grounds are being prepared, repairs are wrapping up, and improvements are in the works. But it is all pointless without you!
Dining Room Tear Down
A building in the process of collapse is being taken down for safety. It was an extension to the dining room added around 1955.
Plaza Repair
On the south Plaza, a retaining wall was failing. Not only was it eating away at the plaza, but it was also a safety concern, causing us to close the path below. Over the winter, the wall was replaced and will hopefully last 100 years, just like the last one
BEFORE
Water Fount Upgrade
We inspected the plumbing, replaced the return line, and upgraded the pump that lifts water the last 10 feet and supplies it to the spickets. Benefit: more reliable, faster flow. Come get the healing water.
Celebration Tent
The tent is up and ready for meals, community, fellowship, and rest.
Two New Bathrooms
We are finishing two new bathrooms, accessible from the back of the Oratory. Appropriate for families with young children. The location prevents that awkward trip to the bathroom that goes right past the ambo during the Father’s sermon!
Everything we do at the Our Lady, Patroness of America Center is for you, Our Lady’s children.